news center

Ground sign construction instructions


I.Use and characteristics:

The product is mainly used for temporary diversion of roads and car parks,squares,public places and other places where indoor and outdoor vehicles do not often run over;it can also be used for safety islands,isolation piers,isolation columns and other elevation places.The product has the characteristics of convenient construction,fast,easy to remove and no residue after removal.

Second,the use of environment:

1、Use in an environment where the air temperature is not less than 5℃and the ground temperature is not less than 10℃.

2、The construction road must be clean,dry and smooth.

3、After rain,the road surface must be fully dry before construction.Dry for at least 24 hours before construction.

Three,the use of methods and steps:

1、Clean up the paste surface.The place where the labeling tape is needed should be cleaned thoroughly.For those places where the surface has construction floating materials and small lumps fall easily,the floating materials must be removed with a wire brush before construction.

2、Draw the contour line of the tape and logo pattern at the place where the tape and logo are to be applied.

3、After clearing the area,stick the tape directly onto it.

4、After pasting,it must be pressurised by means of heavy crushing(car),rubber hammering and manual stepping,especially the corners of the marking tape should be carefully beaten in order to make the surface fully bonded.

5、For use on the road,to ensure the strength of adhesion with the ground,apply glue on the ground once if necessary.

6、When it is necessary to apply glue on the surface to be pasted,the pasting effect will be good within 5-10 minutes after the glue is applied.